Electrical Contracting Projects
SIEMENS, Istanbul Airport, 100.000 I/O, SCADA RTU Installation and Cabling,
TUPRAS, Oil Refinery, Syncronization of 4 Step-up 11KV-34.5KV, 50MVA Transformers,
İZOCAM, Oven Revision of Rockwool and Fiberwool Production Factory,
İZOCAM, Dilovası, Revision of Hot and Cold Part of the Production Oven,
İZOCAM, Electrical and Automation project of the Rockwool Pipe Alufolio Coating Machine, (Simatic S7, TP ve 4-axis Servo, AC Drivers),
İZOCAM, GEBKİM OSB, 1600 kVA Distribution and 1000kVAr Compensation Kompanzasyon with Energy SCADA,
Control and Automation Projects
ACCACIA, Copper Mine, Kastamonu, The Pumping System Automation for Disposal Water Treatment,
OPET, Giresun Oil Terminal, The Automation of Industrial Disposal Water Treatment, WinCC 7.5 SCADA,
SETAŞ Chemicals, Cerkezkoy, The Automation of Liquid Osmosis Process,
AKSARAY ALL-WOOL Rockwool Plant, Replacing the Complete SCADA System with SIEMENS WinCC 7.5
AKSARAY ALL-WOOL Rockwool Plant, The Automation of Blending Preparation System,
THYSSEN KRUPP INDUSTRIAL, BAGFAŞ, ICAPS, Loop&Signal Checks, Instrumentation and Commissioning for AN and CAN Production Line,
ŞİŞECAM, Process SCADA System,
ŞİŞECAM, Ruscam Automation and Energy SCADA System,
FORD OTOSAN, Production Line Automation with Simatic S7,
IZOCAM, Automation of Rockwool Production Line,
İZOCAM, Siemens S5-S7 PLC and OP Replacemenet of Line-1 Rockwool Packing Machine,
UNILEVER ALGIDA, SCADA and Automation of Cold Store,
TIRYAKI, Automation and SCADA System of Grain Silos with Truch Tracking and Monitoring,
TRAKYA CAM, Automation of Float Glass Production Line,
TRAKYO CAM, Revision of Float Glass and Auxiliary Facilities,
TMO, Automation of 100,000 ton capacity Grain Silos,
ESKİ, Eskişehir-Sivrihisar, SCADA and Automation of Water Treatment Plant,
İSKİ, Düzce , SCADA and Automation of Water Treatment Plant,
NUH ÇİMENTO, Automation of Lime Production Unit with Simatic S7
Automation of Machinery and Production Lines,
DEKOR RULO FIRÇA, Automation of Manufacturing Machines with Servo-Motors,
ZENTİVA, Automation Revision of Medical Pil Packing Machines,
KIRKLARELİ CAM SANAYİ, 4-Axis Servo Safya Machine Automation with Simatic S7, and HMI,
ÇAYIROVA BORU, Automation and Production Line with SCADA and MIS Systems,
AROMSA, Dosing Unit,
Displacements of Machinery and Production Lines
TI OTOMOTİV, Displacement of Vehicle Fuel Tank Production Line,
AKZO NOBEL, (Server Boya) Disassembly and Reassembly of the Complete Paint Factory, and all Electrification Works,
Mechanical and Infra-Structure Projects
İSKİ, Baltalimanı, Steel Construction of the Administration Building,
ISKI, Construction of 50 Valve Chambers and Installation of 476 Valves,
ISTANBUL HAVALİMANI, Construction of DN1000 Sized Water Pipeline, 10 DN1000 Valve Chambers with Valve Installations,
ASM, İSKİ, Silahtar And Sarıyer Büyükdere Water Pump Station Construction,
İSKİ, Istanbul Baltalimanı Sewage Treatment Plant, Installation of Steel, GRP and HDPE Pipe Line,
İSKİ, İstanbul Baltalimanı, Sewage Treatment Plant, DN2200, DN2300 and DN3000 GRP Pipe Line Installation and Pump Station Construction,
İSKİ, Route Detection of DN1000-DN2000 Pipe Line,
İSKİ, Sarayburnu, 2x 35m Long Steel Bridge Constructions for DN1000 Water Pipe Line,
İSKİ, Kağıthane, 25m Long Steel Bridge Contruction for DN1000 Water Pipe Line,
İSKİ, Mechanical and Construction Works of 105 Pump Stations for Central SCADA Project,
İSKİ, Yeniköy (Şile), Pump Station Construction,
İSKİ, Hünkartepe, Pump Station Construction,
İSKİ, Paşaköy, Pump Station Construction,
İSKİ, Kaynarca Köyü (Beykoz), Pump Station Construction,
İSKİ, Paşamandıra, Pump Station Construction,
Highway Tunnel Automation Projects,
KARAYOLLARI GM, Kastamonu, Yenigün Highway Tunnels, Lighting Control Systems,
KARAYOLLARI GM, Karadeniz Highway Tunnels, Installaiton and Commissioning of 27 Air Quality Measurement Equipments (CODEL),
KARAYOLLARI GM, Tunnels of Bomonti-Dolmabahçe and Piyalepaşa-Kasımpaşa , Electromechanical Works and Consultancy,
KARAYOLLARI GM, Vecdi Diker Tunnel, Automation and Revision with Simatic S7, WinCC,and Soft Starter,